Build day 2
The injectors are wired, I found they cannot be repined, due to the stock pins being larger but I just cut the lsj harness, inserted the wire into the prong and soldered them shut, that way if it needs to return to stock, the pins are still there un-damaged.
The Idler and tensioner pulleys are in, Like mentioned in other how to's I had to ground down some boss's on the block for it to fit.
Dry fitted the air intake and made some slack for the MAF sensor
Intake mani installed, But I did have to edit my dual pass, the boss was to tall like some of you thought, and I grounded some off the 90 fitting as-well and the mani slide in like butter.
before I cut down the added boss
after
Im waiting on my secondary heatexchanger, I may just run the lsj's alone and install the cobras once it comes in.
There is very little left
-cut the belt
-run the plumbing
-bolt down the m62
-weld in the o2 bung for the wideband
and thats about it.